What is the payback period formula?
The most common measure is the simple payback period. More detailed analyses also use net present value and internal rate of return, but payback is a clear starting point for a first decision.
- Payback period (years) = Total investment ÷ Annual net benefit
- Annual net benefit = Labour savings + Quality gains + Extra output − Annual operating costs
- ROI (%) = (Total net benefit over economic life − Total investment) ÷ Total investment × 100
Which inputs do you need?
| Input | Why it matters |
|---|---|
| Total investment | Turnkey amount including robot, gripper, safety, software, integration and training. |
| Shifts and working days | Set how many hours a year the cell runs and how large the savings are. |
| Labour cost at the station | Operators per shift and the total cost to the employer. |
| Scrap and rework | Quality losses that drop as consistency improves. |
| OEE | Availability × performance × quality; compare current and target values. |
| Operating costs | Maintenance, spare parts, energy, service and program updates. |
Worked example (hypothetical numbers)
The example below only illustrates the method. The numbers are round and entirely hypothetical; they do not represent a real price, cost or customer result. Amounts are given in generic "units" rather than a currency.
| Item | Example value |
|---|---|
| Total investment | 1,000 units |
| Annual labour savings (2 shifts) | 400 units |
| Annual reduction in scrap and rework | 50 units |
| Annual extra output contribution | 50 units |
| Annual operating costs | 100 units |
| Annual net benefit | 400 + 50 + 50 − 100 = 400 units |
| Payback period | 1,000 ÷ 400 = 2.5 years |
How does the number of shifts affect payback?
The investment barely changes with the number of shifts, but savings grow with each extra shift. In the same example, running three shifts would increase labour savings and shorten the payback period. That is why cobots in multi-shift plants usually pay back faster.
Use only items you can measure with confidence. Benefits such as workplace safety, ergonomics and lower staff turnover are real, but when they are hard to quantify, note them separately.
Try your own numbers with the ROI calculator
Use our ROI calculator for a quick estimate with your own shift, labour and investment assumptions. We update the result with real cycle times and the quoted amount during the discovery visit.